New construction project in Pinoso or in the Alicante region, we can build this spectacular ultra-modern designer villa in various sizes.
We apply different prices for places further away.
The villa will be delivered turnkey within a period of 6/11 months on the chosen plot or location, after all building permits have been obtained. (the building permit application procedure takes approximately 6-16 weeks).
The example villa will have a size of 180 square meters on two floors with 3 to 4 bedrooms and 2 or 3 bathrooms.
This includes: The spacious living room with fireplace, large glass windows and spacious living kitchen.
3 or 4 Spacious bedrooms, one of which is the master bedroom with private bathroom, the other bedrooms share one bathroom.
The design can be 100% adjusted to the wishes and needs of the customer.
The house will be delivered with the Utilities: fixed water pipe or water deposit, energy, ecological septic tank.
When will construction start?
After signing the deed of sale and approval from you or the bank.
Is the plot included in the price?
“Yes” the price of the plot is included in the final price and depending on the location.!
More and less work:
Is sanitary and tile work included in the price?
"YES". Standard tiling costs up to a maximum of €20 per m2 and the quality of the sanitary facilities is included in the price, in accordance with the technical description.
It is possible to make your own choices in this, this will be charged as extra / less work.
Is it possible to build the villa bigger?
“YES” it is possible to do the villa to be built larger and it also depends on the size of the plot that is purchased, for example: a rustic plot of at least 10,000 sqm can you 2% of it surface to cultivate.
Does construction interest have to be paid?
“YES” construction interest must be paid for each completed construction phase 10%.
Term Schedule.
This is the schedule stated in the building contract and what will be agreed with you. No dates are mentioned.
Invoicing takes place when a described construction phase has been reached, which you agree with the contractor.
Is it being built under warranty?
"YES". The contractors we work with are mandatory Provide guarantee and guarantee arrangements
What is the maximum age for getting a mortgage?
Mortgage lending is not age-related. caixa Bank, Global caja in Pinoso will give you more information about providing a Mortgage or extension thereof.
Prices updated according to the new “Technical Building Decree” of November 2019 / 2023, in accordance with the new external control of the Energy Certificate of the property. This new law ensures improvements in the field of insulation, solar boiler, protective solar glazing and an overall improvement in the energy efficiency of the property. With each concrete pour, the mixture will be tested by the laboratory. You will receive the results from us in “acta de resultado de ensayo”